So going to go with the Gates belt on the 900s as part of my winter maintenance and adding on stuff.
I have seen some videos on a belt change. Some roll off and roll new one on, saw one where the secondary front part is pulled off then belt put on and the part is lined up and bolted back in place. Also saw one where a ratchet was used to turn the secondary to roll new belt on. This is the way I am leaning.
Last winter me and Olewassername put on the FUTV UHMW skid plate. We realized that the combined age of the two of us installing the skid was 129 years. Soooo knowing that, I am thinking using the ratchet to turn the pulley is going to make easier for us. Just want some opinions.
Thanks